国产精品婷婷久久久久久,国产精品美女久久久浪潮av,草草国产,人妻精品久久无码专区精东影业

畢業(yè)設(shè)計(jì) 28m裝配式預(yù)應(yīng)力混凝土簡(jiǎn)支t梁設(shè)計(jì).docx

約54頁DOCX格式手機(jī)打開展開

畢業(yè)設(shè)計(jì) 28m裝配式預(yù)應(yīng)力混凝土簡(jiǎn)支t梁設(shè)計(jì),摘要預(yù)應(yīng)力混凝土梁式橋在我國橋梁建筑上占我重要的地位,在目前,對(duì)于中小跨徑的永久性橋梁,無論是公路橋梁或者城市橋梁,都在盡量采用預(yù)應(yīng)力混凝土梁式橋,因?yàn)檫@種橋梁具有就地取材,工業(yè)化施工,耐久性好,適應(yīng)性強(qiáng),。整體性好以及美觀等多種優(yōu)點(diǎn)。本設(shè)計(jì)采用裝配式簡(jiǎn)支t梁結(jié)構(gòu),其上部結(jié)構(gòu)由主梁、橫隔梁、行車道板,橋面部分和支座等組...
編號(hào):20-198788大小:61.43K
分類: 論文>土木工程/建筑論文

內(nèi)容介紹

此文檔由會(huì)員 ljjwl8321 發(fā)布

摘 要
預(yù)應(yīng)力混凝土梁式橋在我國橋梁建筑上占我重要的地位,在目前,對(duì)于中小跨徑的永久性橋梁,無論是公路橋梁或者城市橋梁,都在盡量采用預(yù)應(yīng)力混凝土梁式橋,因?yàn)檫@種橋梁具有就地取材,工業(yè)化施工,耐久性好,適應(yīng)性強(qiáng),。整體性好以及美觀等多種優(yōu)點(diǎn)。
本設(shè)計(jì)采用裝配式簡(jiǎn)支T梁結(jié)構(gòu),其上部結(jié)構(gòu)由主梁、橫隔梁、行車道板,橋面部分和支座等組成,顯然主梁是橋梁的主要承重構(gòu)件。其主梁通過橫梁和行車道板連接成為整體,使車輛荷載在各主梁之間有良好的橫向分布。橋面部分包括橋面鋪裝、伸縮裝置和欄桿等組成,這些構(gòu)造雖然不是橋梁的主要承重構(gòu)件,但它們的設(shè)計(jì)與施工直接關(guān)系到橋梁整體的功能與安全,這里在本設(shè)計(jì)中也給予了詳細(xì)的說明。
本設(shè)計(jì)主要受跨中正彎矩的控制,當(dāng)跨徑增大時(shí),跨中由恒載和活載產(chǎn)生的彎矩將急劇增加,是材料的強(qiáng)度大部分為結(jié)構(gòu)重力所消耗,因而限制的起跨越能力,本設(shè)計(jì)采用27m標(biāo)準(zhǔn)跨徑,合理地解決了這一問題。在設(shè)計(jì)中通過主梁內(nèi)力計(jì)算、應(yīng)力鋼筋的布置、主梁截面強(qiáng)度與應(yīng)力驗(yàn)算、行車道板及支座、墩臺(tái)等等設(shè)計(jì),完美地構(gòu)造了一座裝配式預(yù)應(yīng)力混凝土簡(jiǎn)支T梁橋,所驗(yàn)算完全符合要求,所用方法均與新規(guī)范相對(duì)應(yīng)。本設(shè)計(jì)重點(diǎn)突出了預(yù)應(yīng)力在橋梁中的應(yīng)用,這也正體現(xiàn)了我國橋梁的發(fā)展趨勢(shì)。
關(guān)鍵詞:預(yù)應(yīng)力,簡(jiǎn)支T梁,后張法,應(yīng)力驗(yàn)算
Abstract

The prestressed concrete beam plate bridge occupies my important status in our country bridge construction, in at present, regarding small span permanent bridge, regardless of is the highway bridge or the city bridge, all as far as possible is using the prestressed concrete beam plate bridge, because this kind of bridge has makes use of local materials, the industrialization construction, the durability is good, compatible, integrity good as well as artistic and so on many kinds of merits.
This design uses assembly type simple support T beam structure, its superstructure by the king post, septum transversum beam, the lane board, the bridge floor part and the support and so on is composed, the obvious king post is the bridge main carrier. Its king post connects into the whole through the crossbeam and the lane board, enable the vehicles load to have the good traverse between various king posts .Bridge floor part including compositions and so on flooring, expansion and contraction installment and parapet, these structures although is not the bridge main carrier, but their design and the construction relates the bridge whole directly the function and the security, here has also given the detailed explanation in this design.
This design mainly steps the sagging moment control, when the span increases, cross the bending moment which produces by the dead load and the live load the sharp growth, is the material intensity majority of consumes for the structure gravity, thus limits the spanning ability, this design uses the 27m standard span, has solved this problem reasonably. In the design through the king post endogenic force computation, the stress steel bar arrangement, king post section intensity and stress checking calculation, lane board and support, pillar Taiwan and so on designs, a structure assembly type prestressed concrete simple support T beam bridge, the checking calculation completely has conformed to the requirement perfectly, uses the method and the new standard corresponds. This design has highlighted the pre-stressed with emphasis in the bridge application, this has also been manifesting our country bridge trend of development.

Key word: Pre-stressed, Simple support T beam,Tensioning,Stress checking calculation


目 錄
摘要…………………………………………………………………………………………… 1
Abstract……………………………………………………………………………………… 2
前言…………………………………………………………………………………………… 5
第1章 橋型設(shè)計(jì)方案 ………………………………………………………………………6
1.1方案一:預(yù)應(yīng)力鋼筋混凝土簡(jiǎn)支梁(錐型錨具)………………………………6
1.1.1 基本構(gòu)造布置 ……………………………………………………………… 6
1.1.2 設(shè)計(jì)荷載 …………………………………………………………………… 6
1.2方案二:鋼筋混凝土箱形拱橋……………………………………………………7
1.2.1方案簡(jiǎn)介………………………………………………………………………7
1.2.2尺寸擬定………………………………………………………………………7
1.2.3橋面鋪裝及縱橫坡度…………………………………………………………8
1.2.4施工方法………………………………………………………………………8
1.2.5總結(jié)……………………………………………………………………………8
1.3 橋型方案三:預(yù)應(yīng)力混凝土連續(xù)剛構(gòu)方案(比較方案)…………………………8
第2章 上部結(jié)構(gòu)設(shè)計(jì) ……………………………………………………………………… 9
2.1 計(jì)資料及結(jié)構(gòu)布置 ……………………………………………………………… 9
2.1.1設(shè)計(jì)資料………………………………………………………………………9
2.1.2橫截面布置……………………………………………………………………9
2.1.3橫截面沿跨長變化………………………………………………………… 12
2.1.4橫隔梁的布置……………………………………………………………… 13
2.2 主梁作用效應(yīng)計(jì)算……………..