xx休養(yǎng)所施工組織設(shè)計(jì)-畢業(yè)論文.doc

約127頁(yè)DOC格式手機(jī)打開展開

xx休養(yǎng)所施工組織設(shè)計(jì)-畢業(yè)論文,摘 要   本畢業(yè)設(shè)計(jì)為xx休養(yǎng)所相應(yīng)工程量計(jì)算、相應(yīng)施工圖預(yù)算以及施工組織設(shè)計(jì),總建筑面積12227平方米。施工組織設(shè)計(jì)是對(duì)工程建設(shè)項(xiàng)目全過程的構(gòu)思設(shè)想和具體安排,用來指導(dǎo)施工項(xiàng)目全過程各項(xiàng)活動(dòng)的技術(shù)、經(jīng)濟(jì)和組織的綜合性文件。工程造價(jià)是投資者的投資命脈,而施工組織設(shè)計(jì)則是建筑施工組織的核心和靈魂,一個(gè)好的施工組織關(guān)系...
編號(hào):45-275489大小:4.39M
分類: 論文>土木工程/建筑論文

內(nèi)容介紹

此文檔由會(huì)員 272363639 發(fā)布

摘   要
   本畢業(yè)設(shè)計(jì)為xx休養(yǎng)所相應(yīng)工程量計(jì)算、相應(yīng)施工圖預(yù)算以及施工組織設(shè)計(jì),總建筑面積12227平方米。施工組織設(shè)計(jì)是對(duì)工程建設(shè)項(xiàng)目全過程的構(gòu)思設(shè)想和具體安排,用來指導(dǎo)施工項(xiàng)目全過程各項(xiàng)活動(dòng)的技術(shù)、經(jīng)濟(jì)和組織的綜合性文件。工程造價(jià)是投資者的投資命脈,而施工組織設(shè)計(jì)則是建筑施工組織的核心和靈魂,一個(gè)好的施工組織關(guān)系到一個(gè)工程能否順利有序的實(shí)施,關(guān)系到一個(gè)施工項(xiàng)目的成敗。
   本次畢業(yè)設(shè)計(jì)的內(nèi)容主要分為兩部分。第一部分:計(jì)算標(biāo)高在3.550-6.850裙樓部分工程量,套消耗量定額,進(jìn)行相應(yīng)部分的施工圖預(yù)算;然后小組進(jìn)行工程量匯總,再套消耗量定額,對(duì)本工程進(jìn)行施工圖預(yù)算,得出本工程的費(fèi)用及材料、機(jī)械消耗數(shù)量。第二部分:施工組織設(shè)計(jì),根據(jù)本工程的特點(diǎn)和施工條件及工期和質(zhì)量要求,合理劃分施工段并確定施工流向,編制出切實(shí)可行的施工方案;根據(jù)各分部分項(xiàng)工程的劃分,編制施工組織進(jìn)度計(jì)劃表,保證主導(dǎo)工序的連續(xù)施工;對(duì)人、財(cái)、物等資源進(jìn)行優(yōu)化,確定合適的資源需要量計(jì)劃;根據(jù)計(jì)算確定材料堆場(chǎng)面積,根據(jù)現(xiàn)場(chǎng)的實(shí)際情況,進(jìn)行垂直機(jī)械、堆場(chǎng)面積、道路等的布置,從而確定合理的施工平面圖;采取各項(xiàng)技術(shù)組織管理措施,確保工程的順利實(shí)施。本畢業(yè)設(shè)計(jì)主要目的是:培養(yǎng)學(xué)生綜合運(yùn)用所學(xué)基礎(chǔ)理論和專業(yè)知識(shí),解決建筑工程中的施工圖紙審查、施工技術(shù)和施工組織問題的能力。

關(guān)鍵詞  工程量、施工圖預(yù)算、施工組織設(shè)計(jì)、施工方案、主要目的
ABSTRACT
  The graduation design for Shandong jining city retires to the second army retired cadres in retreat, the corresponding construction drawing budget and the construction organization design, total construction area of 12227 square meters. The construction organization design is the process of construction of the project design and construction projects, to guide the whole technical and economic activities and comprehensive files. Project cost is the lifeblood of the investment, and the construction organization design, construction and organization is the core and soul, a good construction organization in relation to a project implementation, smooth and orderly in relation to the success or failure of a construction project.
   The main content of graduation design is divided into two parts. The first part: part of each calculation, consumption quota, corresponding parts of the construction drawing budget, Then again, the team quantity of consumption quota consolidated, engineering construction drawing budget, the engineering cost and materials, mechanical consumption quantity. The second part: the construction organization design, according to the characteristics of engineering and construction conditions and time limit and quality requirements, the reasonable construction and construction flow, formulate feasible construction scheme, According to the division of division, sectional engineering construction progress schedule, guarantee the construction process leading, For human, financial, material resources optimization, determining the appropriate resource demand plan, According to the calculation of material, according to determine the actual situation of the site, the vertical machinery, stacking area, road, thus determining reasonable arrangement of the construction plan, Adopt various technical and organizational management measures, to ensure the smooth implementation of projects
Key words: Quantities, Construction drawing budget ,Construction organization design,Construction plan,The main purpose


目    錄
摘   要 I
ABSTRACT II
第1章工程量計(jì)算 1
1.1建筑面積及四線兩面計(jì)算 1
1.2標(biāo)高在3.550-6.850裙樓部分工程量計(jì)算表 1
1.3標(biāo)高在3.550-6.850裙樓部分鋼筋工程量計(jì)算明細(xì)表 7
1.4標(biāo)高在3.550-6.850裙樓部分工程量匯總表 39
第2章 施工組織設(shè)計(jì) 41
2.1編制說明 41
2.1.1總說明 41
2.1.2施工組織設(shè)計(jì)編制的基本原則 41
2.2編制依據(jù) 42
2.3工程概況 42
2.4施工方案及施工技術(shù)的選擇 43
2.4.1 施工臨時(shí)用水用電方案 43
2.4.2建筑材料進(jìn)場(chǎng)方案 44
2.4.3材料進(jìn)場(chǎng)質(zhì)量驗(yàn)證 44
2.4.4施工機(jī)械選擇方案 45
2.4.5基礎(chǔ)工程施工方案 45
2.4.5.1基礎(chǔ)工程施工要求 45
2.4.5.2基礎(chǔ)工程施工方法 46
2.4.5主體工程施工方案 48
2.4.5.1主體工程施工要求 48
2.4.5.2模板工程施工方法 50
2.4.5.3鋼筋工程施工方法 51
2.4.5.4混凝土工程施工方法 54
2.4.5.5砌筑工程施工方法 56
2.4.5.6 測(cè)量工程 57
2.4.5.7 樓地面工程施工方法 58
2.4.5.8 屋面及防水工程 60
2.4.6裝飾工程施工方案 62
2.4.6.1主要裝飾工程施工工序 62
2.4.6.2外墻抹灰、刷涂料、粘貼文化石 63
2.4.6.3內(nèi)墻、頂棚抹灰、刷乳膠漆 65
2.4.6.4吊頂施工 66
2.4.6.5樓地面工程 67
2.4.6.6門窗工程 68
2.4.6.7衛(wèi)生間和洗手間墻面磁磚 71
2.4.6.8室外工程(室外設(shè)施裝修) 71
2.4.7施工方法技術(shù)復(fù)核 72
2.5施工進(jìn)度計(jì)劃 72
2.5.1 施工進(jìn)度計(jì)劃計(jì)算 72
2.5.2計(jì)算勞動(dòng)量、確定各施工過程的施工天數(shù) 73
2.6 施工進(jìn)度計(jì)劃?rùn)M道圖 74
施工進(jìn)度計(jì)劃?rùn)M道圖(見附圖) 74
2.7施工平面圖 74
2.7.1工程施工平面圖設(shè)計(jì)原則 74
2.7.2各種材料堆場(chǎng)面積和各種臨時(shí)設(shè)施的計(jì)算 75
2.8工期保證總措施 76
2.8.1 主體施工進(jìn)度保證措施 78
2.8.2建立優(yōu)良監(jiān)督管理體系 78
2.9主要技術(shù)經(jīng)濟(jì)指標(biāo) 79
2.10雨季與冬季施工措施 79
2.10.1雨季施工措施 79
2.10.2冬季施工措施 80
2.11 環(huán)境保護(hù)措施 80
結(jié)束語(yǔ) 81
致  謝 82
參考文獻(xiàn) 83
附  錄 84