新建660mw超臨界機(jī)組鍋爐割管檢查,摘 要:隨著我國經(jīng)濟(jì)、社會發(fā)展,國家降低能耗、節(jié)能減排政策的不斷深入,火電機(jī)組不斷向高參數(shù)、大容量方向發(fā)展,目前國內(nèi)超臨界、超超臨界鍋爐開始大量、集中建設(shè)和投運(yùn),從已投運(yùn)機(jī)組的試運(yùn)及投運(yùn)后的運(yùn)行情況來看,頻繁爆管是困擾超、超超臨界機(jī)組的一個主要問題,割管檢查此項(xiàng)工作開展時間不長,經(jīng)驗(yàn)不是很多,本文主要介紹電廠2×660...
內(nèi)容介紹
此文檔由會員 牛奶咖啡 發(fā)布
摘 要:隨著我國經(jīng)濟(jì)、社會發(fā)展,國家降低能耗、節(jié)能減排政策的不斷深入,火電機(jī)組不斷向高參數(shù)、大容量方向發(fā)展,目前國內(nèi)超臨界、超超臨界鍋爐開始大量、集中建設(shè)和投運(yùn),從已投運(yùn)機(jī)組的試運(yùn)及投運(yùn)后的運(yùn)行情況來看,頻繁爆管是困擾超、超超臨界機(jī)組的一個主要問題,割管檢查此項(xiàng)工作開展時間不長,經(jīng)驗(yàn)不是很多,本文主要介紹電廠2×660MW超超臨界機(jī)組在建設(shè)過程中割管檢查的部位、檢查方法,檢查效果等進(jìn)行介紹。
關(guān)鍵詞:新建機(jī)組;鍋爐防爆;割管檢查;實(shí)例分析
Abstract: As China's economic and social development, the state to reduce energy consumption, energy-saving emission reduction policies, continued to deepen,Thermal power unit to keep the high-parameter, large-capacity develop in the direction。Domestic supercritical, ultra supercritical boilers began to large, concentrated efforts to build and put into operation in,Generating units have been put into operation from the trial operation and put into operation after the operation point of view, frequently burst pipe is troubled super, ultra-supercritical unit in a major problem。Cutting tube inspections to carry out this work is not long, experience, not many。This paper describes xing chang Plant 2×660MW USC In the construction process the site of cutting tube inspections, inspection methods, inspection results, etc. are introduced
Key words: New Units; Boiler Explosion; Cutting tube inspections; Case Study
關(guān)鍵詞:新建機(jī)組;鍋爐防爆;割管檢查;實(shí)例分析
Abstract: As China's economic and social development, the state to reduce energy consumption, energy-saving emission reduction policies, continued to deepen,Thermal power unit to keep the high-parameter, large-capacity develop in the direction。Domestic supercritical, ultra supercritical boilers began to large, concentrated efforts to build and put into operation in,Generating units have been put into operation from the trial operation and put into operation after the operation point of view, frequently burst pipe is troubled super, ultra-supercritical unit in a major problem。Cutting tube inspections to carry out this work is not long, experience, not many。This paper describes xing chang Plant 2×660MW USC In the construction process the site of cutting tube inspections, inspection methods, inspection results, etc. are introduced
Key words: New Units; Boiler Explosion; Cutting tube inspections; Case Study
TA們正在看...
- 國家電網(wǎng)公司企業(yè)文化網(wǎng)絡(luò)試題答案.doc
- 國家電網(wǎng)公司電力安全工作規(guī)程火電廠動力部分.doc
- 國家留學(xué)基金管理委員會出國留學(xué)申請表訪學(xué)類.doc
- 國家籃球二級裁判考題.doc
- 國家級重點(diǎn)技師學(xué)院評估標(biāo)準(zhǔn).doc
- 國家規(guī)定花樣跳繩等級1-6級.doc
- 國家計算機(jī)2級等級考試-c語言上機(jī)編程100題庫-必備.doc
- 國家計算機(jī)二級msoffice選擇題及答案解析118套.doc
- 國家語言文字工作有關(guān)法律.法規(guī).方針.政策.doc
- 國慶節(jié)活動策劃方案.doc