工會(huì)新址文圖兩館工程施工組織設(shè)計(jì).doc
約96頁DOC格式手機(jī)打開展開
工會(huì)新址文圖兩館工程施工組織設(shè)計(jì),目錄第一章編制依據(jù)··················································2第二章工程概況··················································4第三章施工部署···································...


內(nèi)容介紹
此文檔由會(huì)員 道客巴巴 發(fā)布
目 錄
第一章 編制依據(jù)··················································2
第二章 工程概況··················································4
第三章 施工部署··················································5
第四章 施工準(zhǔn)備··················································12
第五章 各分部分項(xiàng)工程的主要施工方法······························21
第六章 工程質(zhì)量技術(shù)保證措施······································53
第七章 安全生產(chǎn)的保證措施········································59
第八章 文明施工及環(huán)保措施········································67
第九章 工期保證措施··············································74
第十章 消防保衛(wèi)措施··············································76
第十一章 雨季施工措施············································77
第十二章 冬季施工措施············································79
第十三章 地下管線及其他地上地下設(shè)施的加固措施····················84
參考文獻(xiàn)··························································96
附:附表
1、擬投入的主要施工機(jī)械設(shè)備情況表
2、勞動(dòng)力計(jì)劃表
3、臨時(shí)用地表
4、工藝圖
5、施工進(jìn)度計(jì)劃
6、施工總平面圖
第一章 編制依據(jù)··················································2
第二章 工程概況··················································4
第三章 施工部署··················································5
第四章 施工準(zhǔn)備··················································12
第五章 各分部分項(xiàng)工程的主要施工方法······························21
第六章 工程質(zhì)量技術(shù)保證措施······································53
第七章 安全生產(chǎn)的保證措施········································59
第八章 文明施工及環(huán)保措施········································67
第九章 工期保證措施··············································74
第十章 消防保衛(wèi)措施··············································76
第十一章 雨季施工措施············································77
第十二章 冬季施工措施············································79
第十三章 地下管線及其他地上地下設(shè)施的加固措施····················84
參考文獻(xiàn)··························································96
附:附表
1、擬投入的主要施工機(jī)械設(shè)備情況表
2、勞動(dòng)力計(jì)劃表
3、臨時(shí)用地表
4、工藝圖
5、施工進(jìn)度計(jì)劃
6、施工總平面圖