xx新建煤礦東三采區(qū)(課程設(shè)計說明書),摘要本設(shè)計為xx礦務(wù)集團(tuán)新強煤礦150mt/a東三采區(qū)設(shè)計,該采區(qū)有一個可采煤層,煤層傾角17°,煤層厚度為2.83m。煤質(zhì)為焦煤,瓦斯含量較高。該采區(qū)平均走向長度為1800 m,傾斜長度868.8m。該采區(qū)的工業(yè)儲量為618.3mt,可采儲量為315.3mt,服務(wù)年限為3.4年。設(shè)計該采區(qū)采用綜采,一個回采工作面生產(chǎn)...
內(nèi)容介紹
此文檔由會員 白癡學(xué)東西 發(fā)布
摘要
本設(shè)計為xx礦務(wù)集團(tuán)新強煤礦150Mt/a東三采區(qū)設(shè)計,該采區(qū)有一個可采煤層,煤層傾角17°,煤層厚度為2.83m。煤質(zhì)為焦煤,瓦斯含量較高。該采區(qū)平均走向長度為1800 m,傾斜長度868.8m。該采區(qū)的工業(yè)儲量為618.3Mt,可采儲量為315.3Mt,服務(wù)年限為3.4年。
設(shè)計該采區(qū)采用綜采,一個回采工作面生產(chǎn)。采煤工藝為綜合機械化采煤工藝,頂板處理方法為全部垮落法。采煤機截深0.8m,進(jìn)刀方式為端部斜切進(jìn)刀,采煤機往返一次割兩刀,雙向割煤,工作制采用“四、六”制作業(yè),三班生產(chǎn),一班檢修。
關(guān)鍵詞:采區(qū)設(shè)計,走向長壁,采煤機
Abstract
This is designed to Qitaihe Mining Coal Group Xinli. 150Mt / a East III design mining area, the mining area has one coal seam, 17degrees seam inclination. , The total thickness of coal seams for the 2.83metres. Coal for coke, a low gas content. Mining area to the average length of 1800 metres, tilt the length of 868.8metres. Mining area of the reserves of industrial 618.3Mt, recoverable reserves of 315.3Mt, length of service was 3.4years. The design of the mining area to the use of longwall mining method, production of a coal face. Mechanized coal mining technology for integrated process approach for the entire roof falling Act. Shearer deep 0.8metres, for feed into the cut end of the triangular oblique coal, two-way cut coal, the work of the system of "four, six," the production industry, the three shifts of production, maintenance intervals.
Keywords:The design district,longwall mining,coal mining machine
目 錄
摘 要 1
Abstract 1
第1章 采區(qū)地質(zhì)情況 1
1.1 井田概況 1
1.2 采區(qū)地質(zhì)情況 2
第2章 采區(qū)儲量與生產(chǎn)能力 4
2.1 采區(qū)儲量 4
2.2 采區(qū)生產(chǎn)能力 4
2.3 采區(qū)服務(wù)年限 5
第3章 采區(qū)方案設(shè)計 6
3.1 采煤方法的選擇 6
3.2 采區(qū)巷道布置 6
3.3 巷道斷面設(shè)計 7
第4章 回采工藝 11
4.1 落煤 11
4.2 支護(hù) 12
4.3 采空區(qū)處理方法 12
4.4 采煤工藝 13
4.5 生產(chǎn)技術(shù)管理 13
4.6 安全技術(shù)措施 13
第5章 采區(qū)生產(chǎn)系統(tǒng) 17
5.1 采區(qū)運輸 22
5.2 采區(qū)通風(fēng) 22
本設(shè)計為xx礦務(wù)集團(tuán)新強煤礦150Mt/a東三采區(qū)設(shè)計,該采區(qū)有一個可采煤層,煤層傾角17°,煤層厚度為2.83m。煤質(zhì)為焦煤,瓦斯含量較高。該采區(qū)平均走向長度為1800 m,傾斜長度868.8m。該采區(qū)的工業(yè)儲量為618.3Mt,可采儲量為315.3Mt,服務(wù)年限為3.4年。
設(shè)計該采區(qū)采用綜采,一個回采工作面生產(chǎn)。采煤工藝為綜合機械化采煤工藝,頂板處理方法為全部垮落法。采煤機截深0.8m,進(jìn)刀方式為端部斜切進(jìn)刀,采煤機往返一次割兩刀,雙向割煤,工作制采用“四、六”制作業(yè),三班生產(chǎn),一班檢修。
關(guān)鍵詞:采區(qū)設(shè)計,走向長壁,采煤機
Abstract
This is designed to Qitaihe Mining Coal Group Xinli. 150Mt / a East III design mining area, the mining area has one coal seam, 17degrees seam inclination. , The total thickness of coal seams for the 2.83metres. Coal for coke, a low gas content. Mining area to the average length of 1800 metres, tilt the length of 868.8metres. Mining area of the reserves of industrial 618.3Mt, recoverable reserves of 315.3Mt, length of service was 3.4years. The design of the mining area to the use of longwall mining method, production of a coal face. Mechanized coal mining technology for integrated process approach for the entire roof falling Act. Shearer deep 0.8metres, for feed into the cut end of the triangular oblique coal, two-way cut coal, the work of the system of "four, six," the production industry, the three shifts of production, maintenance intervals.
Keywords:The design district,longwall mining,coal mining machine
目 錄
摘 要 1
Abstract 1
第1章 采區(qū)地質(zhì)情況 1
1.1 井田概況 1
1.2 采區(qū)地質(zhì)情況 2
第2章 采區(qū)儲量與生產(chǎn)能力 4
2.1 采區(qū)儲量 4
2.2 采區(qū)生產(chǎn)能力 4
2.3 采區(qū)服務(wù)年限 5
第3章 采區(qū)方案設(shè)計 6
3.1 采煤方法的選擇 6
3.2 采區(qū)巷道布置 6
3.3 巷道斷面設(shè)計 7
第4章 回采工藝 11
4.1 落煤 11
4.2 支護(hù) 12
4.3 采空區(qū)處理方法 12
4.4 采煤工藝 13
4.5 生產(chǎn)技術(shù)管理 13
4.6 安全技術(shù)措施 13
第5章 采區(qū)生產(chǎn)系統(tǒng) 17
5.1 采區(qū)運輸 22
5.2 采區(qū)通風(fēng) 22
TA們正在看...
- 淺談改良早期預(yù)警評分在預(yù)檢分診中的應(yīng)用.ppt
- 淺談教師在小學(xué)教育教學(xué)管理中的重要性.doc
- 淺談教師如何打造有效課堂.doc
- 淺談教師如何撰寫教育論文.doc
- 淺談教師如何教育關(guān)愛留守兒童.doc
- 淺談教師對學(xué)生的影響.doc
- 淺談教師怎樣與學(xué)生相處.doc
- 淺談教師管理中存在的幾個問題.doc
- 淺談數(shù)學(xué)方法論在數(shù)學(xué)教學(xué)中的應(yīng)用.doc
- 淺談數(shù)學(xué)核心素養(yǎng)在高考試題中的呈現(xiàn)方式及復(fù)習(xí)滲透.doc