同煤電網(wǎng)優(yōu)化設(shè)計(jì),摘要同煤電網(wǎng)由于設(shè)備陳舊,電網(wǎng)負(fù)荷分配不合理,不僅處于較差的運(yùn)行狀態(tài)下,而且存在著安全隱患,對(duì)電網(wǎng)進(jìn)行優(yōu)化已經(jīng)勢(shì)在必行。設(shè)計(jì)首先敘述了同煤電網(wǎng)的概況,在收集了數(shù)據(jù)的基礎(chǔ)上對(duì)同煤電網(wǎng)建立模型,并且將這些數(shù)據(jù)錄入至psasp7.0中,制作出系統(tǒng)的單線圖,建立電網(wǎng)的基礎(chǔ)數(shù)據(jù)庫(kù),并且模擬多種不同運(yùn)行方式建立相應(yīng)...
編號(hào):60-204965大小:1.95M
分類: 論文>電氣自動(dòng)化/電力論文

該文檔為壓縮文件,包含的文件列表如下:

內(nèi)容介紹

原文檔由會(huì)員 ccc971854870 發(fā)布

同煤電網(wǎng)優(yōu)化設(shè)計(jì)

摘要

同煤電網(wǎng)由于設(shè)備陳舊,電網(wǎng)負(fù)荷分配不合理,不僅處于較差的運(yùn)行狀態(tài)下,而且存在著安全隱患,對(duì)電網(wǎng)進(jìn)行優(yōu)化已經(jīng)勢(shì)在必行。設(shè)計(jì)首先敘述了同煤電網(wǎng)的概況,在收集了數(shù)據(jù)的基礎(chǔ)上對(duì)同煤電網(wǎng)建立模型,并且將這些數(shù)據(jù)錄入至PSASP7.0中,制作出系統(tǒng)的單線圖,建立電網(wǎng)的基礎(chǔ)數(shù)據(jù)庫(kù),并且模擬多種不同運(yùn)行方式建立相應(yīng)潮流分析的方案進(jìn)行潮流分布計(jì)算,得出合理結(jié)果后將其作為分析的數(shù)據(jù)基礎(chǔ)。通過(guò)對(duì)潮流計(jì)算結(jié)果分析后找出電網(wǎng)運(yùn)行中的不合理和薄弱環(huán)節(jié),最后根據(jù)各種方式計(jì)算電網(wǎng)各種運(yùn)行方式下的損耗,重點(diǎn)分析問(wèn)題嚴(yán)重的幾個(gè)變電所,提出解決方法,分析和總結(jié)出可行的調(diào)整方案并從經(jīng)濟(jì)角度進(jìn)行對(duì)照,進(jìn)行可行性分析,最后得出優(yōu)化后電網(wǎng)的運(yùn)行狀況,總結(jié)被改善的環(huán)節(jié)。
關(guān)鍵字:同煤電網(wǎng);電力系統(tǒng)潮流分析;PSASP7.0;調(diào)整方案

 

 

Abstract

Datong Coal Mine Group Power Grid as a result of obsolete equipment, unreasonable load distribution, the operation not only in poor condition, but also there is a security risk ,the power grid must be optimized. First the design describe the overview of Datong coal industry group power grid ,build the model of Datong coal industry group power grid based on the collection of data, and entry these data to PSASP7.0, to establish the single system map, the basic database for grid, and simulate different methods of operation to establish the corresponding plans of power flow calculation and execute the calculation, the reasonable results will be the data basis of analysis. The results of trend analysis to identify unreasonable and weak parts in the operation of the power grid, and finally based on a variety of ways of calculating and the power grid loss under various operating mode, analysis of several substation problems, make propose solutions, analyze and summarize the possible adjustment programs and control from an economic point of view, to conduct a feasibility analysis, came to the conclusion that the optimized operation of the grid, summing up the part improved.
Keywords: Datong Coal Industry Group Grid; Power Flow Analysis; PSASP7.0;
adjustment programs


目錄

0  前言 1
1  概述 2
1.1  電網(wǎng)力系統(tǒng)優(yōu)化的一般方法 2
1.2  電力系統(tǒng)仿真軟件的發(fā)展 3
1.3  論文完成的主要工作 3
2  電網(wǎng)模型建立 5
2.1  同煤電網(wǎng)概況 5
2.2  各個(gè)元件的計(jì)算模型 7
2.2.1  輸電線路的參數(shù)及等值電路 7
2.2.2  變壓器參數(shù)及其等值電路 10
2.2.3  電網(wǎng)負(fù)荷及電源模型 14
3  PSASP7.0中的潮流分析計(jì)算 16
3.1  PSASP7.0的使用簡(jiǎn)介 16
3.2  潮流分析計(jì)算 19
3.2.1  潮流分布計(jì)算概述 19
3.2.2  PSASP潮流計(jì)算流程 21
3.2.3  潮流分析計(jì)算的執(zhí)行 23
4  對(duì)潮流計(jì)算的結(jié)果分析 28
4.1  北部環(huán)網(wǎng)的計(jì)算結(jié)果與分析 28
4.2  南部電網(wǎng)的潮流結(jié)果及分析 35
4.3  電網(wǎng)的結(jié)線合理性 48
5  技術(shù)經(jīng)濟(jì)分析 49
6  結(jié)論 50
致謝 51
參考文獻(xiàn) 52
附錄A  譯文 53
附錄B  外文原文 60