国产精品婷婷久久久久久,国产精品美女久久久浪潮av,草草国产,人妻精品久久无码专区精东影业

畢業(yè)設(shè)計 洮兒河主河道橋施工圖設(shè)計.rar

RAR格式版權(quán)申訴手機(jī)打開展開

畢業(yè)設(shè)計 洮兒河主河道橋施工圖設(shè)計,摘 要長白線一級公路,洮兒河主河道中橋初步設(shè)計為3×30m的預(yù)應(yīng)力混凝土簡支t形梁橋。該橋采用并列雙幅布置,左、右幅橋等長。上部為裝配式全預(yù)應(yīng)力鋼筋混凝土簡支t梁。預(yù)制t梁高2.1m,主梁間距2.0m。為降低主梁高度,減少預(yù)應(yīng)力引起的上拱度,后張法預(yù)應(yīng)力混凝土t梁在設(shè)計荷載下按全預(yù)應(yīng)力混凝土構(gòu)件設(shè)計,主梁配筋采用預(yù)應(yīng)力...
編號:125-210329大小:2.14M
分類: 論文>土木工程/建筑論文

該文檔為壓縮文件,包含的文件列表如下:

內(nèi)容介紹

原文檔由會員 ljjwl8321 發(fā)布

摘 要
長白線一級公路,洮兒河主河道中橋初步設(shè)計為3×30m的預(yù)應(yīng)力混凝土簡支T形梁橋。該橋采用并列雙幅布置,左、右幅橋等長。上部為裝配式全預(yù)應(yīng)力鋼筋混凝土簡支T梁。預(yù)制T梁高2.1m,主梁間距2.0m。為降低主梁高度,減少預(yù)應(yīng)力引起的上拱度,后張法預(yù)應(yīng)力混凝土T梁在設(shè)計荷載下按全預(yù)應(yīng)力混凝土構(gòu)件設(shè)計,主梁配筋采用預(yù)應(yīng)力筋和非預(yù)應(yīng)力筋混合配筋。錨具采用OVM15—6型錨具,錨具變形鋼筋回縮按3㎜計。預(yù)制件在張拉鋼絞線時混凝土的強(qiáng)度應(yīng)達(dá)到85%以上方可張拉。下部橋墩為鋼筋混凝土圓形雙柱式墩,墩柱直徑1.0m;橋墩基礎(chǔ)為鉆孔灌注樁基礎(chǔ),樁徑1.2m。橋墩蓋梁為連續(xù)墩蓋梁,按簡支梁計算蓋梁內(nèi)力及墩柱頂豎向反力。樁基為單排樁形式,采用正循環(huán)泥漿護(hù)壁成孔。

















關(guān)鍵詞:T梁,預(yù)應(yīng)力,后張法,錨固,鉆孔灌注樁


Abstract
Chang bai line level of roads, in Tao'er River main channel bridge preliminary design for 3×30m prestressed concrete simple support T shape beambridge.
This bridge uses the compound double amplitude arrangement, the left and right bridge and so on is long. Upside for assembly type entire prestressed rinforcement concrete simple support T roof beam. Prefabricated T roof beam high 2.1m, king post spacing 2.0m. In order to reduce the king post altitude, reduces the camber which the pre-stressed causes, tensioning prestressed concrete T roof beam under the design load according to the entire prestressed concrete component design, the king post matches the muscle to use the pre-stressed muscle and the non-pre-stressed muscle mixes the syngamy muscle. The anchorage uses the OVM15-6 anchorage, the anchorage deformed bar' deformed reinforc bar retraction according to 3㎜ the idea. Pre-workpiece when Zhang Lagang stranded wire the concrete intensity should achieve above 85% only then opens pulls. Lower part the bridge pier is the reinforced concrete circular distyle distyle pillar, foot stall diameter 1.0m; Pier footing for drill hole irrigation pile foundation, pile diameter 1.2m. Bridge pier Ge Liang for continual pillar Ge Liang, calculates Ge according to the simple beam the Liang endogenic force and the pillar mast top vertical reaction. Pile foundation use for single piling form, The pile foundation uses mud propects wall of main circulation becomes to hole.










Key words:Chest beam ,Prestress ,Posttenioning concrete ,Anchorage ,Drilled

目 錄

引 言 1
1 設(shè)計總說明 5
2 設(shè)計計算書 10
2.1 上部結(jié)構(gòu) 10
2.1.1 設(shè)計資料及構(gòu)造布置 10
2.1.2 行車道板計算 12
2.1.3 主梁內(nèi)力計算 15
2.1.4 主梁配筋計算 32
2.1.5 主梁截面幾何特性計算 36
2.1.6 承載能力極限狀態(tài)計算 37
2.1.7 預(yù)應(yīng)力損失計算 41
2.1.8 正常使用極限狀態(tài)計算 46
2.1.9 持久狀況應(yīng)力驗算 53
2.1.10 短暫狀態(tài)應(yīng)力驗算 56
2.1.11 橫隔梁內(nèi)力計算 57
2.1.12 支座的設(shè)計計算 62
2.2 下部結(jié)構(gòu) 64
2.2.1 蓋梁荷載計算 65
2.2.2 內(nèi)力計算 72
2.2.3 截面配筋設(shè)計與承載力效核: 75
2.2.4 橋墩墩柱計算 78
2.2.5 鉆孔灌注樁計算 83
3 設(shè)計圖紙 92
4 施工組織 93
4.1 預(yù)應(yīng)力T梁施工技術(shù) 93
4.2 施工方案 95
4.2.1 工程概況 95
4.2.2 施工準(zhǔn)備 95
4.2.3 施工方案及程序編制 96
4.2.4 質(zhì)量保證措施 103
4.2.5 安全施工 104
4.2.6 環(huán)境保護(hù)措施 105
參考文獻(xiàn) 107
致 謝 108