国产精品婷婷久久久久久,国产精品美女久久久浪潮av,草草国产,人妻精品久久无码专区精东影业

某框架結(jié)構(gòu)高校綜合實(shí)驗(yàn)樓設(shè)計(jì).rar

RAR格式版權(quán)申訴手機(jī)打開展開

某框架結(jié)構(gòu)高校綜合實(shí)驗(yàn)樓設(shè)計(jì),畢業(yè)設(shè)計(jì)計(jì)算書,建筑圖,梁和結(jié)構(gòu)平面圖。摘 要通過本模擬設(shè)計(jì),可使學(xué)生綜合土木工程專業(yè)各課程的知識(shí),了解建筑設(shè)計(jì)方法,熟悉結(jié)構(gòu)設(shè)計(jì)與分析過程。設(shè)計(jì)期間內(nèi)完成的主要工作如下:(1)外文翻譯、調(diào)研、復(fù)習(xí)相關(guān)課程、畢業(yè)設(shè)計(jì)開題——寒假、第1周;(2)建筑設(shè)計(jì),繪制建筑施工圖——第5~6周;(3)建...
編號(hào):99-322893大小:3.53M
分類: 論文>土木工程/建筑論文

該文檔為壓縮文件,包含的文件列表如下:

內(nèi)容介紹

原文檔由會(huì)員 zzy13141314 發(fā)布

某框架結(jié)構(gòu)高校綜合實(shí)驗(yàn)樓設(shè)計(jì)

畢業(yè)設(shè)計(jì)計(jì)算書,建筑圖,梁和結(jié)構(gòu)平面圖。

摘    要

通過本模擬設(shè)計(jì),可使學(xué)生綜合土木工程專業(yè)各課程的知識(shí),了解建筑設(shè)計(jì)方法,熟悉結(jié)構(gòu)設(shè)計(jì)與分析過程。設(shè)計(jì)期間內(nèi)完成的主要工作如下:(1)外文翻譯、調(diào)研、復(fù)習(xí)相關(guān)課程、畢業(yè)設(shè)計(jì)開題——寒假、第1周;(2)建筑設(shè)計(jì),繪制建筑施工圖——第5~6周;(3)建筑結(jié)構(gòu)布置和荷載計(jì)算——第7周;(4)豎向荷載作用下橫向框架內(nèi)力計(jì)算(采用彎矩二次分配法)——第8周;(5)水平荷載作用下橫向框架內(nèi)力計(jì)算及側(cè)移計(jì)算(采用D值法)——第9~10周;(6)橫向框架梁柱內(nèi)力組合、PK電算比較和截面設(shè)計(jì)——第11~12周;(7)主樓梯結(jié)構(gòu)設(shè)計(jì)——第13周;(8)基礎(chǔ)結(jié)構(gòu)設(shè)計(jì)——第14周;(9)繪制橫向框架、主樓梯、基礎(chǔ)的結(jié)構(gòu)施工圖——第12~14周;(10)用PKPM軟件對整棟框架結(jié)構(gòu)進(jìn)行SATWE電算并繪制出標(biāo)準(zhǔn)層結(jié)構(gòu)平面圖(板配筋圖)和梁配筋平面圖——第15~16周。
通過這次模擬設(shè)計(jì),我對建筑的平面布置有了更進(jìn)一步的了解,掌握了梁和柱截面的估算,記住了一些基本的建筑荷載,梁和柱的荷載計(jì)算及傳導(dǎo)方式都有了一定的掌握。豎向荷載作用下橫向框架內(nèi)力計(jì)算采用的彎矩二次分配法,和水平荷載作用下橫向框架內(nèi)力計(jì)算及側(cè)移計(jì)算采用的D值法都有了一定的掌握,對PKPM的運(yùn)用,一些參數(shù)的調(diào)整以及其中的道理有了長足的進(jìn)步,手工繪圖的速度也得到了極大的加快,發(fā)現(xiàn)用EXCEL表格等類似工具去計(jì)算彎矩二次分配法是非常的快捷,算是這一次模擬設(shè)計(jì)的一個(gè)收獲。
關(guān)鍵詞:彎矩;剪力;配筋;抗震

Design of comprehensive experiment of college building of a frame structure
Abstract

Through the simulation design, can make comprehensive civil engineeringstudents each course knowledge, design methods to understand thearchitecture, familiar with the structure design and analysis process. The main work to complete the design period are as follows: (1) foreign language translation, research, review of related courses, graduation design topic --winter, first weeks; (2) the architectural design, drawing construction drawing-- the 5~6 week; (3) computing -- seventh weeks building structure layout and load; (4) the calculation of internal forces of vertical frame under vertical load (the moment two methods of distribution) -- eighth weeks; (5) calculating the shift calculation and longitudinal side frame internal force under horizontal load (D value method) -- the 9~10 week; (6) the longitudinal frame beam column internal force combination, PK computerization and section design -- the 11~12 week; (7) the main staircase structure design --thirteenth weeks; (8) basic structure design -- fourteenth weeks; (9) the structure construction drawing of vertical frame, the main staircase,foundation -- the 12~14 week; (10) the SATWE calculation and drawing layerstructure plan standard to the entire frame node PKPM software (platereinforcement drawing) and beam reinforcement plans -- the 15~16 week.
Through the simulating design of building layout, I have the further understanding, grasp the estimated Liang Hezhu section, remember some basic construction load, load calculation and conduction ways Liang Hezhuhas mastered. The moment the internal force calculation of the longitudinal frame under vertical loads the two distribution method, calculation and the side vertical frame internal force and horizontal load is calculated by themethod of D shift are mastered, the use of PKPM, some parameters are adjusted and the truth with long strides, hand drawing speed has beengreatly accelerated, found to calculate the moment two methods of distribution is very fast with EXCEL forms and other similar tools, it is a harvest this time simulation design.
Key word:Bending moment; shear; reinforcement; seismic

 

 


目    錄

引    言 - 1 -
第1章 緒    論 - 2 -
1.1 工程概況 - 2 -
1.2 建筑與基礎(chǔ)設(shè)計(jì)型式 - 2 -
1.3 框架計(jì)算方法 - 2 -
1.4 主要進(jìn)程安排 - 2 -
第2章 建筑結(jié)構(gòu)布置和荷載計(jì)算 - 3 -
2.1 確定計(jì)算簡圖 - 3 -
2.2 梁和柱截面尺寸 - 4 -
2.3 材料強(qiáng)度等級(jí) - 4 -
2.4 荷載計(jì)算 - 4 -
2.5 地震作用 - 6 -
第3章 橫向框架內(nèi)力計(jì)算 - 11 -
3.1 恒載作用下的框架內(nèi)力計(jì)算 - 11 -
3.2 活載作用下的框架內(nèi)力 - 19 -
3.3 本工程考慮如下四種最不利組合 - 20 -
3.4 各節(jié)點(diǎn)不平衡彎矩 - 21 -
3.5 內(nèi)力計(jì)算 - 21 -
3.6 地震作用下橫向框架的內(nèi)力計(jì)算 - 33 -
第4章 橫向框架內(nèi)力組合 - 42 -
第5章 橫向框架梁及柱截面設(shè)計(jì) - 52 -
第6章 樓梯結(jié)構(gòu)設(shè)計(jì) - 71 -
6.1 樓梯梯段斜板設(shè)計(jì) - 72 -
6.2 休息平臺(tái)板1設(shè)計(jì) - 73 -
6.3 休息平臺(tái)板2設(shè)計(jì) - 73 -
6.4 梯段梁TL1計(jì)算 - 74 -
6.5 梯段梁TL2計(jì)算 - 75 -
6.6 梯段梁TL3計(jì)算 - 75 -
第7章 基礎(chǔ)結(jié)構(gòu)設(shè)計(jì) - 77 -
7.1 荷載計(jì)算 - 77 -
7.2確定基礎(chǔ)底面積 - 77 -
7.3 地基變形驗(yàn)算 - 80 -
7.4 基礎(chǔ)結(jié)構(gòu)設(shè)計(jì) - 80 -
第8章 建筑與結(jié)構(gòu)設(shè)計(jì)說明 - 85 -
8.1工程概況 - 85 -
8.2設(shè)計(jì)依據(jù) - 85 -
8.3建筑結(jié)構(gòu)設(shè)計(jì)分類等級(jí) - 85 -
8.4主要活荷載(作用)取值 - 85 -
8.5結(jié)構(gòu)材料 - 85 -
結(jié)論與展望 - 87 -
致    謝 - 88 -
參考文獻(xiàn) - 89 -
附    錄 - 90 -
附錄A:畢業(yè)設(shè)計(jì)圖紙清單 - 90 -
附錄B:專業(yè)外文參考文獻(xiàn)及其譯文 - 91 -
附錄C:主要參考文獻(xiàn)的題錄及摘要 - 102 -