国产精品婷婷久久久久久,国产精品美女久久久浪潮av,草草国产,人妻精品久久无码专区精东影业

規(guī)劃發(fā)展------外文翻譯.doc

約3頁DOC格式手機(jī)打開展開

規(guī)劃發(fā)展------外文翻譯,the u.s. navy completed approximately 10 yards of advanced cycle studies culminating in a competitive request for proposals in 1991. the icr development contrac...
編號:10-272944大小:26.50K
分類: 論文>外文翻譯

內(nèi)容介紹

此文檔由會員 wanli1988go 發(fā)布

The U.S. Navy completed approximately 10 yards of advanced cycle studies culminating in a competitive request for proposals in 1991. The ICR development contract was awarded to Westinghouse Electric Crop. Marine Division, in Sunnyvale, Calif. The development team includes Westinghouse Rolls-Royce, in London, U.K.; Allied Signal Aerospace Inc., in Torrance, Calif.; and CAE Electronics Ltd., in Montreal, Quebec, Canada.
The Navy’s ICR timetable supports a ship contract award by 1999, and the first WR-21 engine is scheduled to be on a seagoing by 2004. the WR-21 engines will be used to support both the U.S. Navy new combatant construction and potential allied navy frigate and destroyer programs between 2000 and 2010,

美國海軍大約完成先進(jìn)的周期 10 碼研究達(dá)絕頂?shù)脑?1991 年在對提議的競爭請求中. ICR 發(fā)展契約被頒發(fā)到 Westinghouse 電的農(nóng)作物. 海產(chǎn)的區(qū)分,在 Sunnyvale 中,加州. 發(fā)展隊(duì)在倫敦包括 Westinghouse 勞斯萊斯公司英國;聯(lián)盟的信號航空宇宙公司., 在 Torrance 中,加州.; 而且 CAE 電子學(xué)公司., 在蒙特利爾,魁北克,加拿大.
海軍的 ICR 時間表 1999 之前支援一個船契約獎賞,而且第一個 WR-21 引擎預(yù)定是 2004 之前在 seagoing 上. WR-21 引擎將會用來兩者都支援美國